What Investors Should Check Before Buying a Project Property

Key construction, sitework, permit, and budget questions investors should ask before committing to a property.

What Investors Should Check Before Buying a Project Property

So, here you are, finally found that perfect property that you can turn into a profitable venture and launch your real estate investing enterprise. You can feel the excitement, your spreadsheet looks solid, you already told about it to all your friends and recorded a social media post about your success. But is it? A property can look like an excellent investment on a spreadsheet and become a very different deal once construction realities are uncovered. So, let’s slow down a little, and dig deeper to make sure the star is not going to turn into a dog.

The purchase price may be attractive. The neighborhood may support the finished product. The broker may describe the property as “development-ready,” “ADU-ready” or “ideal for expansion.” But those descriptions do not tell you:

Whether the proposed use is actually permitted

Whether utilities have sufficient capacity

Whether the existing improvements can be economically renovated

Whether grading, drainage or retaining walls will eat up all you profit

Whether plans are complete and approvals are still valid

Whether the construction budget reflects current conditions

Whether the project can be completed within the investor’s timeline and capital structure

Experienced investors do not evaluate a project property solely by asking, “What can I buy it for?” They ask a more important question:

What will it take—in money, time and risk—to turn this property into the finished asset described in the investment plan?

One of the first questions I always ask: if this is such a great opportunity, and the sellers already own the property with all the equity built up to date, why aren’t the sellers doing it themselves? Of course, there maybe some pain, background story, personal situations why the sellers walk away from the projects or properties that may seem like obvious profit makers to you, but knowing the story behind the property always helps you to identify some hidden problems upfront.

Before removing contingencies or committing substantial capital, investors should investigate the following ten areas.

1. Confirm What You Can Build

Do not rely on the listing description, conceptual rendering or seller’s interpretation of the zoning. Their job is to sell you the property, and, quite often, to turn the seller’s problems into your problems.

Confirm the property’s:

Current zoning and general-plan designation

Permitted and conditionally permitted uses

Density and unit limitations

Setbacks, height limits and lot-coverage requirements

Parking requirements

Floor-area-ratio (FAR) limitations

ADU, lot-split or subdivision eligibility (and time frame to complete subdivision)

Overlay zones and special planning areas

Affordable-housing or inclusionary requirements

Prior zoning violations or unpermitted uses

The fact that a neighboring property contains a particular use does not guarantee that the same use can be approved today. Regulations may have changed, the neighboring project may have received a variance, or its approvals may have been granted under different development standards.

Whenever possible, obtain written confirmation or conduct a preliminary review with the appropriate planning authority.

2. Investigate Title, Easements and Access

A property’s usable area may be significantly smaller than its recorded lot size. Many factors can reduce your 10,000 lot that you thought could be split into two 5,000 sf lots into one 3,000 sf buildable pad making the whole project unfeasible.

Review the preliminary title report, survey and available recorded documents for:

Slope severity, soils conditions, environmental concerns, FEMA maps

Current zoning and minimal lot sizes

Jurisdiction (city, county, etc)

Access easements

Utility easements

Drainage easements

Sewer or water lines

Road-widening reservations

Private road obligations

Shared driveway agreements

Maintenance agreements

CC&Rs and deed restrictions

Encroachments

Boundary discrepancies

Existing liens or assessment districts

Legal access and practical construction access are not always the same thing. A site may have a recorded access right but still be difficult or expensive to reach with excavation equipment, concrete trucks, cranes or emergency vehicles.

Ask whether the proposed improvements can be constructed and permanently accessed without relocating utilities, negotiating with neighbors or obtaining additional easements.

3. Verify Utility Availability and Capacity

A utility line near the property does not necessarily mean that the property can connect to it—or that the line has enough capacity for the proposed development.

Confirm:

Water service availability and meter size

Sewer location, depth and capacity

Septic feasibility when public sewer is unavailable

Electrical service and transformer capacity

Natural-gas availability, if needed

Telecommunications access

Fire-flow requirements

Required utility extensions or undergrounding

Connection, capacity and impact fees

Off-site improvements required by utility providers

For vacant land and infill development, utility work can materially change the feasibility of the project. A shallow sewer connection located in front of the property is very different from a connection requiring hundreds of feet of trenching, pavement restoration or an off-site easement.

Do not budget utility work from a map alone. Whenever possible, verify conditions with the serving agencies and appropriate engineers. Ask the seller to provide “Will Serve” letters from all utility companies, or make it part of your due diligence process.

4. Understand the Sitework Before Pricing the Building

Investors frequently focus on the cost of the house, units or commercial improvements while underestimating the cost of preparing the site.

Sitework may include:

Clearing and demolition

Export or import of soil

Rock breaking and excavation

Mass Grading

Soil stabilization or over-excavation

Retaining walls

Stormwater systems

Erosion control

Sewer, water and dry-utility installation

Fire-access improvements

Street, curb, gutter and sidewalk work

Construction access and staging

Landscaping and irrigation

Environmental mitigation

On difficult properties, the work below and around the building can cost as much as the visible structure. In my personal experience, after entitlement risks, site work or horizontal is the second biggest project risk category.

Before acquisition, ask:

How much grading is required?

Is soil being imported or exported? Can it be balanced on site?

Where will exported material be disposed of?

Are retaining walls required?

Can construction equipment safely access the site?

Is there adequate room for staging and material storage?

How will stormwater be managed?

Are off-site improvements required?

Could protected habitat, trees, wetlands or cultural resources affect construction?

A preliminary civil, soils and constructability review may identify risks that are impossible to see during a normal property tour. If the seller can’t produce any plans, reports, or any other essential documentation, always ask why (are they hiding something?), request longer due diligence period and price your purchase accordingly.

5. Review Soils, Drainage and Environmental Conditions

The condition of the ground can dictate the design and economics of the entire project. Depending on the property, investors may need to investigate:

Expansive or collapsible soils

Uncompacted fill

Slope stability

High groundwater

Liquefaction or fault zones

Flood hazards

Prior contamination

Underground storage tanks

Asbestos or lead in existing buildings

Methane conditions

Protected biological resources

Stormwater-treatment requirements

Wildfire and fire-access restrictions

A standard property inspection is not a substitute for the appropriate geotechnical, environmental, drainage or engineering investigation. The important question is not merely whether a condition exists. It is what the condition will require during design, permitting and construction. A soils issue may be manageable—but only if the foundation, grading and contingency budgets account for it.

6. Verify the Real Status of Plans and Permits

“Plans included” and “permits in process” can mean almost anything.

If the seller claims that plans, entitlements or permits add value to the property, request the complete project file and determine:

Which plans have actually been prepared

Whether the plans were submitted

Which agencies reviewed them and what where the results

Whether correction comments remain outstanding

Whether discretionary approvals have been granted

Whether conditions of approval have been satisfied

Whether permits are ready to issue or merely under review

Whether approvals or applications can be transferred

Whether any permits or entitlements are approaching expiration

Whether school, utility, traffic or development fees remain unpaid

Whether the proposed design still meets current codes

Whether the plans match the investor’s intended project

Whether all consultants have been paid or will you inherit their invoices for the work that they have done so far

A conceptual site plan is not an entitlement. An entitlement is not a building permit. An approved permit is not necessarily construction-ready if fees, utility clearances or deferred submittals remain outstanding.

Even if you have approved plans, doesn’t make them good plans. Take time to review them with your trusted architect or engineer and see if there is any room to value engineer the plans and find out how long any changes may take to get approved through the city. It might be worth spending a couple of month making corrections if it can save you $250,000 by removing a 12’ engineered masonry wall by making elevation changes on finished pads.

Investors should understand exactly where the project stands and what remains to be completed.

7. Inspect Existing Improvements Beyond Their Appearance

For renovation and value-add projects, cosmetic condition is only one part of the analysis. Dig deeper, investigate the condition and remaining useful life of:

Foundation and structural framing

Roof and waterproofing

Plumbing and sewer systems

Electrical service and wiring

Heating, ventilation and air conditioning

Windows and exterior envelope

Drainage

Fire and life-safety systems

Accessibility improvements

Unpermitted additions or conversions

Mold, water intrusion or pest damage

Code violations and deferred maintenance

An older property may still be a strong acquisition, but the renovation budget must reflect what is behind the walls—not only the finishes visible during the walkthrough.

Also determine whether the proposed renovation will trigger broader code upgrades. A seemingly limited project can become more expensive if the building department requires accessibility, structural, energy, fire-sprinkler or utility improvements. I’ve seen too many horror stories where a homeowner applied for a room addition and the city ended up requiring the home owner to upgrade the whole house with a fire sprinkler system and install stormwater drainage connected to the city stormwater system, which turned a $50,000 job into a $200,000 nightmare.

8. Build a Complete Project Budget

A construction estimate is not the same as a complete development budget. Don’t just rely on some ballpark numbers, like $250 per s.f. for finished construction. A realistic acquisition analysis should consider:

Purchase price and closing costs

Design and engineering

Surveys and investigations

Permit, school, utility and impact fees

Demolition and sitework

Vertical construction

General conditions and supervision

Insurance and bonding

Financing fees and lender inspections

Construction interest

Taxes and carrying costs

Temporary utilities and security

Marketing, leasing or sales expenses

Owner-supplied materials

Contingency

Closeout and warranty reserves

Be cautious when a budget is based primarily on a cost-per-square-foot assumption. Square-foot pricing can be useful for an early screening, but it does not capture unusual sitework, small-project inefficiencies, utility extensions, premium finishes or off-site requirements.

Every preliminary budget should clearly distinguish among:

Confirmed costs

Contractor estimates

Allowances

Owner assumptions

Excluded items

Contingency reserves

If the project works only when every assumption goes perfectly, it probably does not have a sufficient margin of safety.

9. Connect the Construction Schedule to the Investment Model

Time is a project cost, and sometimes it can be a major cost! The schedule should include more than the physical construction period. Investors must account for:

Due diligence

Design development and approvals

Agency review

Permit corrections

Utility approvals (SDGE is notoriously slow, account for it upfront!)

Financing and lender closing

Long-lead material procurement

Demolition and site preparation

Construction process

Inspections and utility releases

Certificate of occupancy

Lease-up, stabilization or sale (establish realistic absorption rate assumptions)

A six-month construction job can easily become an 18-month investment when preconstruction and closeout are included. Every additional month may increase:

Loan interest

Property taxes

Insurance

Temporary housing or operating expenses

Security and maintenance

Investor preferred returns

Exposure to market changes

Underwrite the credible schedule, not the most optimistic schedule needed to make the projected return appear attractive.

10. Stress-Test the Deal Before You Fall in Love With It

As investors, we are natural optimists and when the deal looks attractive, we want to see the positive side of things and we naturally spend time proving why a deal will work. The more valuable exercise is trying to determine how it could fail.

Test the investment under less favorable assumptions:

What if construction costs increase by 10%?

What if permits take six months longer?

What if interest rates or financing costs rise?

What if the finished property sells for 10% less?

What if rents are lower or lease-up takes longer?

What if an unexpected site condition uses the entire contingency?

What if the project cannot be built exactly as proposed?

Is there an alternative exit?

Can the property be operated, sold or redesigned without destroying the investment?

A strong project does not need perfect conditions to survive. It should have enough margin, liquidity and exit flexibility to absorb problems that are normal in construction and development.

Due Diligence – this is your first line of risk protection, it’s a MUST! Never skip on DD even if you are buying the property for half the price! Use DD period to reduce future risks, not merely to confirm your original opinion or assumptions. The purpose of due diligence is not to collect enough information to feel comfortable with a decision already made. It is to identify the conditions under which the property should be:

Acquired as proposed

Acquired at a lower price

Acquired with additional seller concessions

Extended for further investigation

Restructured through an option, seller financing or phased closing

Passed on entirely

Sometimes the best result of a Project Review is confirmation that the opportunity is sound. Sometimes it is a revised scope or negotiating strategy. And sometimes the most profitable construction decision is deciding not to build—or not to buy—until a critical issue is resolved.

Before You Remove Contingencies, Request a Pro-Tech Project Review

Pro-Tech Design & Build works with homeowners, investors, property owners and developers to evaluate the construction realities behind a proposed acquisition. Since we are investors ourselves, we think like investors and treat your projects as if we are the investors too, i.e. protecting the bottom line.

A pre-acquisition Project Review may examine:

Existing plans and available reports

Preliminary construction scope

Site access and logistics

Grading, utilities and site-improvement requirements

Existing building conditions

Apparent constructability concerns

Preliminary budget assumptions

Permit and approval status

Potential cost exposures

Recommended next steps and additional professional investigations

Pro-Tech does not replace your architect, civil engineer, geotechnical consultant, land-use attorney, inspector or financial advisor. We help connect their information to the practical question every investor ultimately needs answered:

What will it realistically take to build this project?

If you are evaluating a development site, fixer, rental conversion, ADU property, subdivision opportunity or value-add acquisition, contact Pro-Tech before your due-diligence period expires.

Request a Pro-Tech Project Review

Call 619-993-7799, email info@protechbuild.com, or submit a Project Review request through www.ProTechBuild.com.

Pro-Tech Design & Build Inc.
California General Engineering and General Building Contractor
License No. 1066416

This article is provided for general educational purposes and is not legal, engineering, architectural, environmental or investment advice. The scope of every property investigation should be determined by qualified professionals familiar with the specific property and proposed project.